M20 J10a Ashford Kent

About The Job

Construction of a new junction 700 metres south east of junction 10. The work’s included the following:

  • A new roundabout over the motorway
  • New slip roads
  • A new link road to the A2070 Bad Munstereifel Road, with traffic signals on parts of the junction and two 3-lane bridges
  • Removal of the east facing slip roads at the existing junction 10
  • A20 Hythe Road incorporated in the new junction so that the traffic in both directions can travel via the new roundabout
  • A new pedestrian and cycle bridge over the M20 from Kingsford Street to the A20, demolishing the existing Highfield Lane Bridge
  • Replacement of Church Road footbridge over the A2070

Scope of works

SJS Site Engineering was requires to provide aerial surveys for the use of topographical surveys, volumetrics, cut & fill, progress photos & videos, Orthomosaic tiles, planning, trackers, along with processing the datasets.

case study image

case study image

Thor Chemicals Margate

About The Job

Remediation of an existing chemical factory.

Scope of works

The client contacted us to undertake a high detail topographical survey, along with multiple visits to provide GPS surveys to produce as-built drawings & volumetrics.


Wood Wharf Project Canary Wharf

About The Job

Installation of 150 piles & interlocking sheet piles for land reclamation to provide a base to construct a new skyscraper.

Scope of works

SJS were contacted to provide a team of two engineers to provide setting out for a very difficult job. This involved the setting out of marine piles to high accuracy using very large plant, barges, gates & frames. Along with this we were also required to install site control, provide monitoring, design solutions, phasing & problem solving.

case study image

case study image

Three Mills River Stratford

About The Job

Construction of a new river wall consisting new interlocking sheet piles.

  • Monitoring
  • Setting Out (Piling Land & Marine)
  • Surveying

Scope of works

SJS were contracted to provide daily monitoring of the installed sheet piles on three mills river and existing structures, this was kept up to date daily with a spreadsheet. Along with this the job required extensive setting out in difficult locations. Three mills river required many surveys to check designs and create adaptions and solutions for clashes.