M20 J10a Ashford Kent
About The Job
Construction of a new junction 700 metres south east of junction 10. The work’s included the following:
Scope of works
SJS Site Engineering was requires to provide aerial surveys for the use of topographical surveys, volumetrics, cut & fill, progress photos & videos, Orthomosaic tiles, planning, trackers, along with processing the datasets.
Thor Chemicals Margate
About The Job
Remediation of an existing chemical factory.
Scope of works
The client contacted us to undertake a high detail topographical survey, along with multiple visits to provide GPS surveys to produce as-built drawings & volumetrics.
Wood Wharf Project Canary Wharf
About The Job
Installation of 150 piles & interlocking sheet piles for land reclamation to provide a base to construct a new skyscraper.
Scope of works
SJS were contacted to provide a team of two engineers to provide setting out for a very difficult job. This involved the setting out of marine piles to high accuracy using very large plant, barges, gates & frames. Along with this we were also required to install site control, provide monitoring, design solutions, phasing & problem solving.
Three Mills River Stratford
About The Job
Construction of a new river wall consisting new interlocking sheet piles.
Scope of works
SJS were contracted to provide daily monitoring of the installed sheet piles on three mills river and existing structures, this was kept up to date daily with a spreadsheet. Along with this the job required extensive setting out in difficult locations. Three mills river required many surveys to check designs and create adaptions and solutions for clashes.